![]() |
Most all was wired here, all switches I was just waiting on the dimmer switches. |
![]() |
Just a back view of the box. |
![]() |
Double ground rails, switch wires stripped and ready. |
![]() |
Hooking up the grounds. |
![]() |
This is the view after everything has been wired up (aside from some wire nuts, I ran out). There's two ground rails, one common rail and one hot rail. |
![]() |
Test run! Everything worked perfectly! (Excuse the mess!) |
![]() |
Prepped for paint. |
![]() |
Finishing up the bracing and getting ready to put walls on. |
![]() |
First coat of paint on back side. |
![]() |
Painting sides. |
![]() |
First coat of lettering. |
![]() |
Second coat of lettering. |
![]() |
Fun artistic painting prep. |
![]() |
All the panels finished. |
![]() |
All ready for the first night! |
![]() |
Wiring all done up. Also a cameo from the flicker box. |
All pictures are property of EON.I Industries and Myka Rangel.
No comments:
Post a Comment