Monday, January 24, 2011

EON.I Industries "Switch-IE" - Complete

As promised, here's the photos from the rest of the "Switch-IE" build. It was a great and enjoyable project, it had it's ups and downs for sure.
Most all was wired here, all switches I was just waiting on the  dimmer switches.

Just a back view of the box.

Double ground rails, switch wires stripped and ready.

Hooking up the grounds.

This is the view after everything has been wired up (aside from some wire nuts, I ran out). There's two ground rails, one common rail and one hot rail.

Test run! Everything worked perfectly! (Excuse the mess!)

Prepped for paint.

Finishing up the bracing and getting ready to put walls on.

First coat of paint on back side.

Painting sides.

First coat of lettering.

Second coat of lettering.

Fun artistic painting prep.

All the panels finished.

All ready for the first night!

Wiring all done up. Also a cameo from the flicker box.
So that's the project! I would like to mention that one of the nights it rained like crazy! If you notice there is a gap on the top, nothing bad happened the whole night it rained. She was built tough and built well. Keep watching for some new projects here in 2011!

All pictures are property of EON.I Industries and Myka Rangel.

No comments:

Post a Comment